Skip to content
Documentation

Watching Projects and Weekly Reports

updated

Once a week Meldoc emails you a report for each workspace, listing the projects you watch that changed during that week.

Who watches a project

If you are a project’s Maintainer or Admin — through your own collaborator role or through a team — you watch it automatically. Creating a project makes you its Admin, so you watch every project you create. A workspace Admin who holds no role on the project itself does not watch it automatically; workspace administrators can reach every project, and the report is meant for the projects that are yours.

Anyone who can open a project can watch it. Select the eye button next to Share at the top of the project’s overview; select it again to stop watching. The button’s tooltip says whether you watch the project and why.

Your choice stays as you made it when your role changes. If you stop watching a project you maintain, you stay unwatched even though you are still a Maintainer; if you watch a project and later become, or stop being, its Maintainer, you keep watching it.

What the report contains

The report covers the last full week, Monday to Sunday in UTC, and arrives on Monday morning, between 08:00 and 12:00 UTC. If Meldoc cannot send it in that window, that week’s report is skipped rather than sent late. It lists only projects in which at least one document was created, edited, moved, renamed, archived, deleted or otherwise changed that week; changes to a project’s settings or collaborators do not count. For each project it shows how many documents changed, how many are new, how many were removed, how many people made the changes, and links to up to five of the most-changed documents.

If none of the projects you watch changed, you get no email for that workspace that week. You never get more than one report per workspace per week.

Turning reports on and off

Weekly reports are off until you turn them on: open your account settings and switch on Weekly reports under Email notifications, or choose it on the last step of account setup. Watching a project while reports are off sends nothing; Meldoc tells you so when you start watching and offers a link to the setting. If you turn reports on during the week, your first report arrives the following Monday.

Unsubscribe from weekly reports at the bottom of a report turns the setting off for every workspace at once. To stop getting one project in your reports, stop watching that project instead. To stop getting a whole workspace’s report, stop watching its projects.

What’s next?

Creating and Configuring Projects — Give someone the Maintainer role on a project.

Account Settings — Your email notification settings.